New beam and posts.

Metal T and L Strap Ties for beam to posts.



Sunday, January 5, 2012

The guest bathroom as of Saturday, January 4, 2012. Removed tub and back wall green tiles.

Sunday, January 5, 2012 washed down entire inside with water hoses to removed the dust created from demolition.

January 29, 2012


How the guest bathroom looked Saturday morning.

How the guest bathroom looked Sunday.

What was already left of the kitchen looked like Saturday.

The kitchen now looks like this Sunday.




January 15, 2012

CLICK ON PHOTOS TO ENLARGE


 15 yard roll off delivered for dry wall disposal.

Sunday morning group of deer in the east end of property grazing.

Found termite signs in a few 2x4 support frame studs. Looks like termite may have been in the wood at time of construction. No other wood has termite. The studs were removed.

No nut on the bolts holding this wall to the foundation and to the brick wall. Poor quality control from the builder at that time. Never know what lurks behind those wall that the home buyer is unaware of.

January 7 and 8, 2012


  Old style phone jack
Javalena in south side of property. They like the particular cactus growing there.


January 1, 2012...exterior

Front yard looking west.
Clearing the many many large rocks into groups to be used later in landscaping.
Front yard looking east
East side yard
Front yard looking south.
Many Mesquite trees are now trimmed.
Front yard looking north.
The property has many mature saguaro cactus.